• Reconstruction of JFK Boulevard at 22nd Street in Philadelphia
• Existing 24 foot high cast-in-place 40-year-old retaining wall starting to show signs of movement
• Solution was to excavate existing soils behind retaining wall and replace with foamed glass aggregate
• UL-FGA reduced the lateral load to mitigate concerns regarding further movement
• Design concerns included nearby buildings sensitive to construction or permanent disruptions